Ephrata area · Lancaster County

Full bathroom remodel with a jetted tub and tiled walls

An outdated bathroom taken down to the studs and rebuilt with a jetted tub, subway tile walls, new fixtures and slip-resistant floor.

Where
Ephrata area, Lancaster County
Scope
Full gut, jetted tub, tiled surround, vanity, fixtures, LED lighting, slip-resistant floor
Waterproofing
Sheet membrane behind all tile, not just paint-on
Timeline
About two weeks start to finish
Finished bathroom with white subway tile walls and new tub

This bathroom had the usual problems of a house from the 1970s: a cast tub that had lost its finish, wall covering that had been patched a few times, and a vanity that was too small for the room. The owners wanted a tub they could actually soak in and walls that would not need attention again for a long time.

Josh took the room back to the studs. That made it possible to frame a proper deck for the jetted tub, re-route the supply and drain for the new location, and bring the electrical for the pump and the new lighting up to code. The walls around the tub were sheeted in cement board and covered with a sheet waterproofing membrane before a single tile went on, which is the part that keeps a tiled bathroom from leaking into the floor five years later.

The surround is white subway tile run up to the ceiling with a recessed shelf for bottles. The floor is a textured porcelain tile chosen for grip when wet. New fixtures, a wider vanity with storage, and LED lighting finished the room. The whole job took about two weeks, including a couple of days of cure time the tile and membrane need.

The same bathroom after the remodel, with subway tile and new vanity
The old bathroom before the remodel, with dated wall covering and fixtures
BeforeAfter
Drag to compare. The old bathroom before the remodel, with dated wall covering and fixtures / The same bathroom after the remodel, with subway tile and new vanity

Before and after

Same room, same walls.

Drag the handle. The before photo was taken the week demolition started.

Photos

Through the job

  • Old bathroom before demolition
    Before: original wall covering, tub and vanity
  • Bathroom opened to the studs with new framing for the tub deck
    Down to the studs, framing the tub platform
  • New tub set in place with plumbing rough-in visible
    Jetted tub set, plumbing roughed in
  • Walls around the tub covered with orange waterproofing membrane
    Waterproofing membrane before tile
  • Jetted tub installed with cement board walls ready for tile
    Cement board and tub ready for tile
  • Finished tub surround in white subway tile with a shelf niche
    After: subway tile to the ceiling, built-in shelf
  • Finished bathroom vanity and tile
    After: new vanity, lighting and floor

Free estimate

Have something like this in mind?

Tell Josh what the house needs. He will call back, come out, measure, and give you a written estimate with the materials named.

(717) 598-7728

Calls and texts answered seven days a week. Estimates by appointment, Monday to Saturday.

PA HIC #PA125031 · Insured

No sales visit. Josh comes out, measures, and gives you a number.

Call JoshFree estimate